Pre-Construction Project Deliverables
The Castlemaine Maryborough Rail Trail (CMRT) Pre-Construction Project, which is establishing the detailed engineering, environmental, cultural heritage and governance foundations for the future development of the 61 km trail, is now nearing completion.
This project was made possible through the Victorian Government’s Enabling Tourism Fund alongside contributions from Mount Alexander Shire Council, Central Goldfields Shire Council, the Community Bank Avoca, Maryborough and St Arnaud and Castlemaine Maryborough Rail Trail Inc. For background on funding, governance, and project milestones, see Stage Two – The Pre-Construction Phase.
Browse the Complete Public Document Library: CMRT – Public Project Deliverables
1. Media Release & Project Overview
Media Release: Pre-Construction Project Nears Completion – November 2026 – announcement detailing project milestones, partner contributions, and next steps.
2. Governance, Planning & Environmental Assessments
- Operating Model Report – Governance and partnership framework between CMRT, Mount Alexander Shire Council, and Central Goldfields Shire Council.
- Approach and Staging Plan – Phased construction staging, delivery sequencing, and implementation pathway.
- Ecological Due Diligence Report – Assessment of flora, fauna, native vegetation, and environmental considerations along the corridor.
- Ecological Features Mapped
- Cultural Heritage Assessment – Preliminary Aboriginal Cultural Heritage Opportunity assessment (note: the statutory Standard CHMP is currently progressing through formal evaluation).
- VicTrack Corridor Lease Correspondence: Mount Alexander Shire and Central Goldfields Shire – Signed June 2026 letters confirming corridor tenure arrangements.
3. Community & Stakeholder Consultation
Consultations Summary Report – Summary of feedback and engagement outcomes from community drop-in sessions, adjoining landowners, and referral authorities.
4. Reference Design, Specifications & Costings
- Interactive Trail Alignment Map – Explore the 61 km route, trailheads, road crossings, and drone/ground footage by section.
- Full Reference Design & Costings Folder (Parts 01–10) – Includes existing conditions, alignment plans, cross sections, road crossing enlargements, bridge assessments, link trails, works specifications, construction estimates, and ongoing council maintenance models.
5. Foundation Feasibility Study (2023)
- 2023 Castlemaine Maryborough Rail Trail Feasibility Study – Final Report – Stage 1 business case, economic impact modelling, and route viability assessment.
- 2023 Feasibility Study Appendices – Supporting technical appendices and background data.
Partners and Supported by